Well...after a few weeks of "inspections" (read: not doing anything), the crew was back to work on our house this week. They've started on the stone and stucco on the outside. Not much progress on the inside as we still have to our pre-drywall walk through (where I get to tell them what's wrong before the walls go up). So...hopefully that'll be soon b/c as of 5/30 we'll be homeless and the sooner they finish, the sooner we'll be able to move in. Here are some pictures...
First set is of the left side and the garage

They finsihed this whole side this week. This is also the left side just behind the garages. That section that isn't finished is called a gable...it gets done last. It's stucco, so they do the stone first.

This is the other side of the house (right side). The picture on the bottomyou can see the dining room windows on the far left.

Back of the house is getting stucco. Apparantly they have to do 3 coats before they can paint it. I think this is still the first coat.

Some random pictures of the backyard take from the right side of the house.

I tried to do a pano from the back patio so you can get a feel for how the yard lays out. It's got a long way to go before anyone is rolling in the grass.